Fitting a suspension spring canister
Before you start
Difficulty
Intermediate · 2/3
Estimated working time
45 min for 1 person
Guide time for the operation described. Allow extra time for preparation, seized parts and final checks.
Relevant parts and materials
Spring canister matching vehicle and side; inspect rubbers, pull-rod ends, knife edges and retainers.
Find part 3007200Find part 1007200
Select only the version suitable for your vehicle and this job. Listed variants are alternatives; do not automatically order every item.
Tools
Spring-canister spanner or thin 46 mm spanner; second 46 mm or large adjustable spanner; pry bar; suitable grease; jack and axle stands.
This guide describes fitting a complete suspension spring canister to the chassis of a 2CV or Méhari: preparing the ends, positioning the supports, adjusting the nuts, fitting the dust boots and connecting the suspension arms. First check that the canister matches your vehicle version.
Difficulty: 2/3 · Approximate time for the installation shown: 45 minutes · People: 1
Tools: spring canister spanner or thin 46 mm spanner, second 46 mm spanner or large adjustable spanner, suitable grease and a pry bar for controlled counterholding. Safe lifting and supporting equipment is required for work under the vehicle.

The photos show installation on an accessible chassis. Removing an old canister under spring load is not covered by this sequence. Support the vehicle and suspension arms according to the workshop procedure and safely relieve the connections before removing pins or tie-rod ends. Never work under a vehicle supported only by a jack. Do not open or heat the canister: its internal springs store energy. Have a professional carry out the work if the safe unloading procedure is unclear.
1. Remove the tie-rod ends and dust boots
Unscrew the tie-rod ends from the canister to be fitted, with the load safely relieved. Then remove the dust boots. Keep the front and rear identifiable and check the parts for damaged threads, wear and cracks.


2. Prepare the supports and nuts
Remove the canister supports. During preparation, leave one nut on the support and position the other nut beside the canister stop, as shown. This puts the nuts on the correct sides when the support is inserted through the chassis.

3. Grease the chassis supports and position the canister
Grease the contact surfaces of the chassis supports with suitable grease. Then position the canister, starting with the rear. On the canister shown, the rear is marked green. Check the identification on your supplied part; do not rely solely on an arbitrary paint mark.




4. Grease and insert the canister supports
Grease the canister supports. Fit them at the front and rear with the prepared nuts on the correct sides. Make sure everything sits squarely in the chassis supports and the threads engage freely.




5. Set the rear clearance
Turn the outer rear nut until the protruding thread length corresponds to the thickness of the flat part of the dust boot. Compare it with the actual boot, as shown. This does not mean using an arbitrary fixed dimension in millimetres.

6. Prepare the inner nuts and front clearance
Turn the inner rear nut a few turns onto the thread. If the support turns with it, counterhold it carefully as shown; do not damage the canister, thread or chassis support with the pry bar. Then turn the inner front nut a few turns onto the thread as well. Set the front clearance in the same way as at the rear, using the flat part of its dust boot as the reference.


7. Tighten the inner and outer nuts
Tighten the front and rear inner nuts until the outer nuts contact the chassis supports. Then tighten the outer nuts at both ends with suitable tools, counterholding where necessary. Check that the set clearance remains unchanged. This installation description gives no torque for these nuts; use the specification for the supplied version.



8. Fit the rear dust boot and tie-rod end
Slide the rear dust boot onto the tie rod and fit its wide end onto the support. Grease the tie-rod end thread and screw the end onto the rod. Ensure correct thread engagement; the final ride height is checked and adjusted after installation.



9. Prepare and grease the connecting pin
Check the rear dust boot positioning again. Prepare the connecting pin and both retaining clips; one clip is already fitted in the photo. Grease the moving contact surfaces of the tie-rod end and pin.



10. Connect the rear tie rod to the suspension arm
Insert the pin through the rear suspension-arm mounting and the eye of the tie-rod end. Fit the second retaining clip so that the pin is retained on both sides. Check by hand that both clips are fully seated and the pin cannot escape the connection. Do not force loaded parts into alignment.

11. Repeat at the front
Repeat the operations with the dust boot, greased thread, tie-rod end, pin and retaining clips at the front of the canister. Check here too that the boot is properly seated and both retainers are correctly installed.



12. Final checks and ride height
- The canister is correctly oriented and suitable for the vehicle.
- The front and rear supports and nuts are correctly fitted and tight.
- The dust boots fit all around, are not twisted and are not trapped.
- Both tie-rod ends and pins are greased and correctly installed.
- Each pin has both required retaining clips; damaged or loose retainers have been replaced.
- Lower the vehicle safely onto its wheels and check ride height under the correct measuring conditions.
For this, follow the guide Checking and adjusting ride height. Have unusual play, noises or persistent height differences investigated before driving further.

